Prague
Finished in 2017
23 300 m2
Provedené práce
Building A – total surface of 8 900 m2
- The largest reconstruction of stone floors of shopping arcades in Central Europe
- Reconstruction work– was carried out while maintaining 100% operation of all shopping units – night work mode
- Dismantling of original granite floors
- Machine grinding of structural concrete
- Complete leveling
- The subsequent installation of Spanish and French marbles including the final crystallization (delivery of the final brilliance of the stone)
- Incorporating decorative brass elements into the motif of the tile joints
- Restoration of granite tiles in front of the supermarket in the range of 1100 m2
Building D – total SURFACE OF 14 384 m2
- In the new building, a complete realization of concrete screeds with glass fiber in the range of 21 830 m2
- Delivery and assembly of reinforced concrete with corundum filling in the supply corridors of the shopping center in the range of 2 480 m2
- Delivery and installation of marble floors of total surface of 8 400 m2
- Incorporation of decorative brass elements into the motif of the tile joints
- Delivery and instalation of ceramic floors with incorporation of stainless steel elements into the motifs of the tile joints (foodcourt) in the total area of 3 312 m2
- Delivery and installation of ceramic tiles and marble tiles of public sanitary facilities in the range of 2 672 m2 in both buildings A + D