placeholderPrague
successFinished in 2017
office23 300 m2

Provedené práce

Building A – total surface of 8 900 m2

  • The largest reconstruction of stone floors of shopping arcades in Central Europe
  • Reconstruction work– was carried out while maintaining 100% operation of all shopping units – night work mode
  • Dismantling of original granite floors
  • Machine grinding of structural concrete
  • Complete leveling
  • The subsequent installation of Spanish and French marbles including the final crystallization (delivery of the final brilliance of the stone)
  • Incorporating decorative brass elements into the motif of the tile joints
  • Restoration of granite tiles in front of the supermarket in the range of 1100 m2

Building D – total SURFACE OF 14 384 m2

  • In the new building, a complete realization of concrete screeds with glass fiber in the range of 21 830 m2
  • Delivery and assembly of reinforced concrete with corundum filling in the supply corridors of the shopping center in the range of 2 480 m2
  • Delivery and installation of marble floors of total surface of 8 400 m2
  • Incorporation of decorative brass elements into the motif of the tile joints
  • Delivery and instalation of ceramic floors with incorporation of stainless steel elements into the motifs of the tile joints (foodcourt) in the total area of 3 312 m2

 

  • Delivery and installation of ceramic tiles and marble tiles of public sanitary facilities in the range of 2 672 m2 in both buildings A + D