OC Forum Liberec

Liberec Finished in 2010 Celkem 9 800 m2 Stage I (2009) Washbasin desks made of polished black granite Stone staircase elements + washbasin desks Ceramic tiles in archades of 3 800 m2 II. Stage (2010) Stone pavement in archades of 6 000 m2 Installation of outdoor large-format stone plinth

Justice palace Brno

Brno Finished in 2010 38000 m2 Complete supply of exterior and interior stone elements, facades and floors Implemented in collaboration with the company Kamenoprůmysl Letovice

OC Černý Most

Prague Finished in 2013 6 700m2 Large format marble tiles in shopping malls

OC Aupark Bratislava

Bratislava Finished in 2015 1 100 m2 Delivery and installation of ceramic and marble tiles in the shopping arcade (foodcourt) Works made at night while maintaining the daily foodcourt regime 330 m2 of tiles installed on a special separating waterproof membrane Murexin

OC Chodov

Prague Finished in 2017 23 300 m2 Provedené práce Building A – total surface of 8 900 m2 The largest reconstruction of stone floors of shopping arcades in Central Europe Reconstruction work– was carried out while maintaining 100% operation of all shopping units – night work mode Dismantling of original granite floors Machine grinding of structural […]