House on Leitnerova street

Brno Finished 2024 100m2 Installation of stone tiles and paving on Leitnerova street in Brno. Material Emperador dark polished surface and Crema marfil brushed surface.

Residence Sadová

Zlin Finished  2021 120m2 Complete supply and installation of a facade ventilated system on stone anchors at the Rezidence Sadová Zlín apartment building, including insulation with vapor barrier and anti-graffiti coating. Material Travertino Classico.  

Myslivna restaurant

Zlin Finished 2024 200m2 Complete reconstruction of the restaurant Myslivna Zlín. Material Kraličák marble (Králický Sněžník) 1939 and Vračan Marble was covered with a carpet Joints cut out and stitched with polyester The wooden parquet floors of 1939 were also completely renovated

Tiles hall New Jicin

New Jicin Finished 2024 350m2 Refurbishment of old structural concrete in an industrial hall used for years. Converted into a showroom. The result is investment savings for further surface treatment. In addition, it can be permanently polished and is resistant to oils when using chemicals.

River City

Prague Finished in 2022 2500 m2 Installation of ceramic facade Agrob Buchtal material on a steel substructure of our own production. Fastening with the Agrob

MooRER shop

Prague Finished in 2023 100 m2 Large format tiles

Aupark Renovation

Bratislava Finished in 2023 1000 m2 Complete renovation of the marble tiles during the uninterrupted operation of the center carried out at night. Replacement of broken tiles New grout lines Machine grinding Crystallization