Wienna point
Ikea Ostrava
14|15 Building
Zlín Finished in 2014 1 000 m2
Other Projects
Malenovice
OC Zličín
Prague Finished in 2014 5 600m2 Removing of the original stone paving Creating a new concrete membrane All work was carried out in night mode while maintaining full operation of the shopping center Zličín
Residential House Vyšehrad
Prague Finished in 2019 1 700 m2 Facade of sandstone – total of 400 m2 Complete interior tiling – total of 1 300 m2
OC Forum Ústí nad Labem En
Ústí nad labem Finished in 2009 10 900 m2 Facade – total 3 700 m2 Suspened stone facade made of natural sandstone Ceramic facade Granite facade Large-format ceramic tiles, total of 7 200 m2 Sanitary facilities
OC Forum Liberec